September 21, 2017

With a few, minor exceptions, the building envelope is finally enclosed. The curtain wall is up, as is the storefront and glazing; the Prodema panels continue to go up (at a snail's pace); and the limestone is mostly up on the exterior. The materials are gorgeous and I...

September 19, 2017

Pictures just don't do justice! The limestone and Prodema wood panels are the perfect accents to our mostly stucco exterior. The natural beauty of these products are just stunning! Waiting for ACM panels and all fritted glass (we got a quick tease with a few panels up)...

September 12, 2017

Here we have a first glimpse at an interior space of this building! 

Ceiling grid and lights have been installed through out, power has been turned on, and AC is kicking and running (at a very low temperature, if I may add).  Air conditioning the space and drying t...

September 11, 2017

After struggling with flooding a couple of times (perhaps 3 or 4) due to an inefficient drainage design, we finally had the mulch, that once was added on before construction as a mechanism to help maintain the tree's health, removed so the tree roots could dry out...

Please reload

Comments
Recent Posts

January 26, 2018

October 19, 2017

September 21, 2017

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Me
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2015 by C.Silva Architect, LLC. 

This site was designed with the
.com
website builder. Create your website today.
Start Now