

LVT Flooring drama (continued)
After a couple of weeks of deliberation and much consideration, we decided to move forward with the lighter floors only to find out that we could not make the production time to have this floor shipped and installed prior to our scheduled punch list walk through on December 12th. What do we now??? I simply cannot believe we've spent so much time contemplating a flooring option that had a cap on production scheduled to begin tomorrow. (My understanding was that, as long as we